Installation of 3 Jamesway Dura-Chain Xtreme Scraper Units

Installation of 3 Jamesway Dura-Chain Xtreme Scraper Units

mon.-fri. 8am - 4pm

Installation of 3 Jamesway Dura-Chain Xtreme Scraper Units

Buschur Equipment Project

Featuring:

  • Jamesway Dura-Chain Xtreme Scraper

Details:

We Installed one Jamesway Dura-Chain Xtreme Scraper in a 568′ 6 Row sand bedded barn which scrapes all 4 alleys with one drive unit. The other 2 scrapers were installed in a 1068′ 6 Row sand bedded barn that drops into a center dump flume line. This barn includes reversible scrapers in the middle of each alley for additional cleaning and to help reduce the manure load on other V-Blades. These scrapers clean 1/3 of the alley closest to the flume line with each stroke. This allows that portion of the barn to be scraped twice as often.


14648 Coates Road, St. Henry, Ohio 45883


Monday-Friday 8-4 pm
Always available for emergency services.

Installation of 1 Jamesway Dura-Chain Scraper in a 3 Row-Robot Barn

Installation of 1 Jamesway Dura-Chain Scraper in a 3 Row-Robot Barn

mon.-fri. 8am - 4pm

Installation of 1 Jamesway Dura-Chain Scraper in a 3 Row-Robot Barn

Buschur Equipment Project

Featuring:

  • Jamesway Dura-Chain Xtreme Scraper

Details:

We Installed a Jamesway Dura-Chain Scraper in a 3 Row-Robot Barn. This system includes Keystone Tubes running under the alleys which is connected to a covered manure pit.


14648 Coates Road, St. Henry, Ohio 45883


Monday-Friday 8-4 pm
Always available for emergency services.

Design & Installation of a 300 Cow Dairy Flush System

Design & Installation of a 300 Cow Dairy Flush System

mon.-fri. 8am - 4pm

Design & Installation of a 300 Cow Dairy Flush System

Buschur Equipment Project

Featuring:

  • Agpro Flush Valves, Controls, and Jamesway Pumps

Details:

We designed this flush system for a 300 cow dairy barn. Our Installation included 4 Agpro Flush Valves and automated controls. A Jamesway pontoon pump was installed for filling a flush tower. A Jamesway electric pump was installed to empty a reception pit at the end of the sand lane into a first stage lagoon. A second Jamesway electric pump was installed for recirculating water through a flush flume line that an existing barn is scraped into.


14648 Coates Road, St. Henry, Ohio 45883


Monday-Friday 8-4 pm
Always available for emergency services.

Installation of Automated Valmetal Hammer Mill

Installation of Automated Valmetal Hammer Mill

mon.-fri. 8am - 4pm

Installation of Automated Valmetal Hammer Mill

Buschur Equipment Project

Details:

We installed a Valmetal Hammer Mill, a flex auger from a bulk bin, and a control panel to fill automatically that bulk bin from a large grain storage bin. When ground corn runs low, the farmer presses one button to start grinding and is able to get back to other chores.


14648 Coates Road, St. Henry, Ohio 45883


Monday-Friday 8-4 pm
Always available for emergency services.

Installation of 2 Jamesway Alley Cat XD600 Cable Scrapers in a 700 Foot Long Barn

Installation of 2 Jamesway Alley Cat XD600 Cable Scrapers in a 700 Foot Long Barn

mon.-fri. 8am - 4pm

Installation of Jamesway Dura-Chain Alley Scraper in a 220 Foot Long Barn

Buschur Equipment Project

Details:

These scrapers use 2 proximity switches to count rotations of the drive sprocket. This allows for fewer and easier scraper adjustments than the competitors.


14648 Coates Road, St. Henry, Ohio 45883


Monday-Friday 8-4 pm
Always available for emergency services.